Connecting

Connecting chargers to EVesto
NOTE: To correctly record the destination of the Charge Detail Record (CDR), an OCPP (Open Charge Point Protocol) Authorize request is required for each cha...
Mon, 21 Aug, 2023 at 9:10 AM
Connect a charger checklist
NOTE: To determine the destination of the Charge Detail Record (CDR) an OCPP Authorize request is required for each session. Therefore it is best to disabl...
Mon, 21 Aug, 2023 at 9:14 AM
Alfen charger configuration
Introduction The ACE Service Installer tool can be used to configure an Alfen charger. You can download this tool on the Alfen download page. Note: The...
Thu, 3 Aug, 2023 at 4:46 PM
Compatability charger manufacturers
Compatibility requirements To connect a charger to the Longship platform, there are three essential requirements that the charger should meet: Public Int...
Thu, 7 Mar, 2024 at 12:56 PM
Removing a charger
 It's possible to remove a charging station from your system. Go to the "Chargers" section to get an overview. There, you will see three dot...
Mon, 7 Aug, 2023 at 9:51 AM